[{"data":1,"prerenderedAt":66},["ShallowReactive",2],{"announcements-en":3,"news-en-2026-06-09-mesures-provisoires":4},[],{"id":5,"title":6,"body":7,"description":13,"extension":60,"meta":61,"navigation":62,"path":63,"seo":64,"stem":65},"news/news/2026-06-09 mesures provisoires.en.md","Provisional measures endorsed by the judge to limit the use of the most problematic M7 metro trains",{"type":8,"value":9,"toc":56},"minimal",[10,14,17,27,30,33,36,50,53],[11,12,13],"p",{},"The judge has endorsed a partial and provisional agreement reached between STIB, the municipalities and local residents. The agreement provides for several concrete measures until 30 September 2026 to reduce nuisance along metro line 1.",[11,15,16],{},"Regarding the operation of the most problematic trains:",[18,19,20,24],"ul",{},[21,22,23],"li",{},"During weekends, from Friday at 22:00 until Monday at 06:00, STIB has committed to limiting the use of trains 711, 712, 713, 714, 715 and 717 as much as possible.",[21,25,26],{},"On weekday nights, between 22:00 and 06:00, this restriction applies to trains 711, 713, 715 and 717.",[11,28,29],{},"The operation of these trains during the periods concerned must be justified by an absolute operational or maintenance necessity. The court-appointed expert may verify these justifications at STIB’s expense. As the trains are corrected, the list will be updated so that the trains that remain the most problematic continue to be subject to these restrictions.",[11,31,32],{},"A detailed rail-grinding schedule has also been endorsed, with works planned between Montgomery and Stockel in June, July and September.",[11,34,35],{},"STIB must now submit a report every two weeks to the expert and the parties. The report must detail:",[18,37,38,41,44,47],{},[21,39,40],{},"the movements of the trains concerned and any exceptions",[21,42,43],{},"the trains that have been corrected and returned to service",[21,45,46],{},"the rail-grinding work actually carried out",[21,48,49],{},"progress in replacing the problematic bogies",[11,51,52],{},"According to information provided by STIB, 20 of the 32 affected bogies had been replaced by 31 May 2026. The remaining 12 bogies are expected to be replaced by the end of September.",[11,54,55],{},"Stop Bruit Metro welcomes this concrete progress, achieved through the mobilisation of local residents and the municipalities. Effective compliance with these measures and their actual impact on the nuisance will need to be monitored closely.",{"title":57,"searchDepth":58,"depth":58,"links":59},"",2,[],"md",{},true,"/news/2026-06-09-mesures-provisoires.en",{"title":6,"description":13},"news/2026-06-09 mesures provisoires.en",1782566731907]